Uganda Mirror
  • Big Story
  • News
  • Crime
  • Gossip
  • Politics
  • Business
  • Sports
  • Love & Relationships
  • World
No Result
View All Result
SUBSCRIBE
Uganda Mirror
  • Big Story
  • News
  • Crime
  • Gossip
  • Politics
  • Business
  • Sports
  • Love & Relationships
  • World
No Result
View All Result
Uganda Mirror
No Result
View All Result
Home News

New Parliament Chamber Progress Reaches 63%

admin by admin
2026/08/27
in News
Reading Time: 5 mins read
0
New Parliament Chamber Progress Reaches 63%
74
SHARES
1.2k
VIEWS
Share on FacebookShare on Twitter

Construction of Uganda’s New Parliament Chamber has reached 63% overall progress, with an accelerated programme now targeting substantial completion of the Plenary Chamber by 31 August 2027.

You might also like

NDA Spokesperson Abiaz Rwamwiri Charged Over Shs296m Media Funds In Fresh Corruption Scandal

Dangote Arrives in Uganda for Talks With President Museveni After Meeting Ugandan Delegation in Nigeria

Tanzania President Samia Suluhu Arrives In Uganda For Two-Day State Visit

The latest project status report, prepared by the project team and supervising consultants, Ssentoogo & Partners, indicates that progress has improved considerably, supported by the installation of heavy structural steel and the arrival of key imported and specialised materials.

While the current contractual completion date for the overall project remains 30 December 2027, the acceleration plan prioritises the Plenary Chamber and the essential facilities required for its operation, allowing Parliament to potentially begin using the new Chamber four months earlier.

The report states that the overall 63% progress takes into account physical works, materials on site and procurements by the contractor, ROKO Construction Ltd.

STEADY PROGRESS

According to the report, the steady improvement in progress is attributable to the increased pace of installation of the heavy structural steel, which has now reached the apex of the roof, together with the availability of key imported materials.

Roofing and skylight materials are already on site, as are aluminium and glazing materials for the laminated curtain walls, aluminium materials for the blast-resistant glazing façade and all nine lifts.

Roof installation is now underway, with completion of the roof covering targeted for 11 October 2026 — a significant milestone which will allow internal finishes and specialised services to progress in a substantially weather-tight building.

The report notes that the improved progress demonstrates that mitigation measures introduced on the project, including additional secured advance funding and direct payments to critical subcontractors and suppliers, are producing results.

“This is evidence that the mitigation measures involving provision of additional advance and direct payments to sub-contractors and suppliers is yielding positive results for progressive implementation of the works,” the report states.

Major reinforced concrete works forming the structural frame of the New Chamber are also largely complete.

The report further indicates that installation of aluminium profiles for the laminated glazing curtain walls is ongoing.

Materials for the blast-resistant curtain wall façade arrived in Kampala in July and were subsequently inspected at ROKO Construction’s Kawempe yard, where the project team confirmed delivery of the consignment.

The first batch of blast-resistant glazing materials has faced shipping delays arising from transportation challenges linked to the Middle East conflict, but the materials are now in transit and expected in Mombasa in September.

SOUTH WING WORKS COMPLETE

The rehabilitation works to the South Wing of the existing Parliamentary Building have meanwhile been completed.

The report describes ROKO’s quality and workmanship on the completed works as satisfactory and in accordance with the project’s technical specifications and design documentation.

PROJECT CHALLENGES

The status report also sets out the principal challenges that have contributed to delays in the New Chamber project.

These include the acquisition of additional land and subsequent three-metre expansion of the building, which increased the planned capacity of the Chamber from 500 to 600 Members of Parliament.

Essential utilities, including high-pressure water mains, storm-water infrastructure and NBI infrastructure, were also discovered traversing the construction site and had to be relocated before sections of the works could proceed.

The project underwent further design modifications, including changes to accommodate additional facilities and modifications to offices for the Speaker and Deputy Speaker.

Security requirements also changed substantially following a joint assessment by Government security agencies in 2022. This resulted in the requirement for blast-resistant glazed curtain walls and a heavy concrete security wall.

Because the blast-resistant systems are custom-designed and manufactured specifically for the New Chamber, considerable additional time was required for design, sourcing and manufacture.

The report also identifies ROKO’s cash-flow constraints, the COVID-19 pandemic, international shipping and logistical difficulties, and the highly specialised nature of the building’s structural and technological systems among the factors that have affected progress.

ACCELERATED COMPLETION PROGRAMME

The project team has now developed an acceleration strategy aimed at achieving substantial completion of the Plenary Chamber by 31 August 2027, ahead of the overall contractual completion date.

Under the plan, the Plenary Chamber and the facilities essential to its operation will be prioritised. These include Members’ access routes, essential lobbies, sanitation, fire and life-safety systems, power, air conditioning and ventilation, lighting, audio-visual and broadcasting systems, interpretation facilities and secure emergency exits.

The acceleration measures include early procurement of long-lead specialised materials and equipment, controlled advance funding backed by appropriate guarantees, direct payments to critical suppliers and subcontractors, additional specialist resources, parallel work fronts and extended and weekend shifts where required.

ROKO will also be required to meet a series of intermediate milestones, including completion of the roofing, façades and glazing before progressing through specialised services, finishes, testing and commissioning.

Physical progress is expected to reach approximately 71% by December 2026.

Subject to implementation of the acceleration measures and associated funding mechanisms, the programme targets substantial completion of the Plenary Chamber by 31 August 2027, followed by completion, commissioning and handover of the overall project by 30 December 2027.

COMMISSION REVIEWS PROGRESS

Members of the Parliamentary Commission visited the New Chamber project on 26 August 2026 to review the status of the works and the proposed way forward.

During the visit, the Commission was briefed on the progress achieved, the outstanding works and the milestones required to accelerate completion of the Plenary Chamber.

The New Chamber project was conceived to address the growing accommodation requirements of Parliament.

The original Parliamentary Chamber, constructed in 1959, was designed for only 82 Members. The new development will provide a 600-seat Plenary Chamber, additional committee rooms and office accommodation, together with modern security, broadcasting and building-management systems.

ROKO Construction Ltd is the main contractor for the project, whose revised contract value is approximately Shs220 billion.

Share30Tweet19
Previous Post

Rwenzori Marathon 2026 Ends With Record Performances and Tourism Boom

Next Post

BREAKING! King Oyo is Dead

Recommended For You

NDA Spokesperson Abiaz Rwamwiri Charged Over Shs296m Media Funds In Fresh Corruption Scandal

by Simon Peter Kato
November 18, 2026
0
NDA Spokesperson Abiaz Rwamwiri Charged Over Shs296m Media Funds In Fresh Corruption Scandal

National Drug Authority (NDA) Public Relations Manager Abiaz Rwamwiri has been charged with false accounting involving Shs296 million out of Shs324.5 million entrusted to him to conduct media...

Read moreDetails

Dangote Arrives in Uganda for Talks With President Museveni After Meeting Ugandan Delegation in Nigeria

by Daniel Tumwebaze
November 18, 2026
0
Dangote Arrives in Uganda for Talks With President Museveni After Meeting Ugandan Delegation in Nigeria

Aliko Dangote, the industrialist widely described as Africa's richest man, arrived in Uganda on Tuesday evening for a high-level meeting with President Yoweri Kaguta Museveni at State House,...

Read moreDetails

Tanzania President Samia Suluhu Arrives In Uganda For Two-Day State Visit

by Simon Peter Kato
November 18, 2026
0
Tanzania President Samia Suluhu Arrives In Uganda For Two-Day State Visit

Tanzanian President Samia Suluhu Hassan has arrived in Uganda for a two-day State Visit expected to strengthen diplomatic relations and deepen cooperation between the two neighbouring East African...

Read moreDetails

Government Pays Shs373 Billion to 7,721 SGR-Affected Persons, 5,225 Still Await Compensation

by admin
November 18, 2026
0
Government Pays Shs373 Billion to 7,721 SGR-Affected Persons, 5,225 Still Await Compensation

The Government has paid Shs373.07 billion in compensation to 7,721 project-affected persons (PAPs) to pave the way for the construction of the 272-kilometre Malaba-Kampala Standard Gauge Railway (SGR)....

Read moreDetails

Tropical Bank Wins Shs167m Court Battle As Businessman’s Bid to Revive Dismissed Suit Crumbles

by Ritah Kengonzi
November 18, 2026
0
High Court Strikes Down Tropical Africa Bank’s Shs11m Land Claim Over ‘Dead Man’s’ Power of Attorney

The High Court in Mbale has dismissed a businessman’s attempt to revive a Shs167 million lawsuit against Tropical Bank Limited after finding that he failed to serve the...

Read moreDetails
Next Post
BREAKING! King Oyo is Dead

BREAKING! King Oyo is Dead

Related News

Bank Of Uganda Tells Public To Accept All Coins, Including Shs1 And Shs2, as Legal Tender

Bank Of Uganda Tells Public To Accept All Coins, Including Shs1 And Shs2, as Legal Tender

10 hours ago

Photography and the choices within an image

1 day ago
Eight Years in Congo, 449 Days Missing, The Story Of  Sam Mugumya’s Dramatic Return To Prison

Eight Years in Congo, 449 Days Missing, The Story Of Sam Mugumya’s Dramatic Return To Prison

2 days ago
NDA Spokesperson Abiaz Rwamwiri Charged Over Shs296m Media Funds In Fresh Corruption Scandal

NDA Spokesperson Abiaz Rwamwiri Charged Over Shs296m Media Funds In Fresh Corruption Scandal

2 days ago
Dangote Arrives in Uganda for Talks With President Museveni After Meeting Ugandan Delegation in Nigeria

Dangote Arrives in Uganda for Talks With President Museveni After Meeting Ugandan Delegation in Nigeria

2 days ago
Tanzania President Samia Suluhu Arrives In Uganda For Two-Day State Visit

Tanzania President Samia Suluhu Arrives In Uganda For Two-Day State Visit

2 days ago

Popular Stories

  • President Museveni Names 13 New Permanent Secretaries, Including Clerk to Parliament

    President Museveni Names 13 New Permanent Secretaries, Including Clerk to Parliament

    697 shares
    Share 279 Tweet 174
  • Dei Pharma Properties Put Up For Auction Despite Shs723bn Government Investment

    695 shares
    Share 278 Tweet 174
  • Gen Muhoozi Promotes CID Director Tom Magambo To Acting Lieutenant Colonel

    694 shares
    Share 278 Tweet 174
  • Over $30,000 Safari Booking Scandal: Police Take Tubale Safaris Boss to Court Over Alleged Tourist Fraud

    665 shares
    Share 266 Tweet 166
  • Museveni Retires 11 Permanent Secretaries Following Government Reshuffle

    663 shares
    Share 265 Tweet 166
  • Sierra Leone’s Vult Taps Fintech Veteran Esther Linda Nigiwan to Lead Operations Strategy

    659 shares
    Share 264 Tweet 165
  • Ebola Gone, Travel Warning Remains as Uganda Seeks Fresh Talks With US Over Level Four Travel Advisory

    454 shares
    Share 182 Tweet 114
Facebook Twitter Instagram Youtube
Uganda Mirror

Uganda's leading source News in categories of Politics Gossip Crime Sports Business Technology & Education

© 2025 Ug Mirror - A Product of Mirror Digital Limited .

We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “ACCEPT ALL”, you consent to the use of ALL the cookies. However, you may visit "Cookie Settings" to provide a controlled consent.
Cookie SettingsREJECT ALLACCEPT ALL
Manage consent

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may affect your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. These cookies ensure basic functionalities and security features of the website, anonymously.
CookieDurationDescription
cookielawinfo-checkbox-analytics11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics".
cookielawinfo-checkbox-functional11 monthsThe cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional".
cookielawinfo-checkbox-necessary11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary".
cookielawinfo-checkbox-others11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other.
cookielawinfo-checkbox-performance11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance".
viewed_cookie_policy11 monthsThe cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data.
Functional
Functional cookies help to perform certain functionalities like sharing the content of the website on social media platforms, collect feedbacks, and other third-party features.
Performance
Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.
Analytics
Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics the number of visitors, bounce rate, traffic source, etc.
Advertisement
Advertisement cookies are used to provide visitors with relevant ads and marketing campaigns. These cookies track visitors across websites and collect information to provide customized ads.
Others
Other uncategorized cookies are those that are being analyzed and have not been classified into a category as yet.
SAVE & ACCEPT
No Result
View All Result
  • Big Story
  • News
  • Crime
  • Gossip
  • Politics
  • Business
  • Sports
  • Love & Relationships
  • World

© 2025 Ug Mirror - A Product of Mirror Digital Limited .

This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.
Not enough quota to unlock this post
Unlock left : 0
Are you sure want to cancel subscription?