{"id":43951,"date":"2026-10-02T15:09:47","date_gmt":"2026-10-02T12:09:47","guid":{"rendered":"https:\/\/ugmirror.com\/?p=43951"},"modified":"2026-10-02T15:09:49","modified_gmt":"2026-10-02T12:09:49","slug":"early-christmas-gift-katonga-bridge-restored-as-new-structure-reopens-kampala-masaka-highway","status":"publish","type":"post","link":"https:\/\/ugmirror.com\/index.php\/2026\/10\/02\/early-christmas-gift-katonga-bridge-restored-as-new-structure-reopens-kampala-masaka-highway\/","title":{"rendered":"EARLY CHRISTMAS GIFT!!! Katonga Bridge Restored as New Structure Reopens Kampala\u2013Masaka Highway"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Traffic along the Kampala\u2013Masaka Highway is set for a major boost after the newly reconstructed Katonga Bridge was restored and opened to motorists, marking the end of a more than three-year disruption caused by the collapse of the old bridge.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The new Katonga Bridge is reported to be 100 percent complete, with the reconstructed structure designed to withstand flooding and improve the reliability of one of Uganda\u2019s busiest transport corridors.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The bridge was destroyed in May 2023 after heavy rains and flash floods swept through the Katonga area, cutting one of the country&#8217;s major highways and forcing motorists to rely on lengthy alternative routes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The disruption affected the movement of passengers, agricultural produce and commercial cargo between Kampala and southwestern Uganda, with traders and transport operators facing longer journeys and increased operating costs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Government subsequently embarked on an emergency reconstruction programme covering Katonga as well as flood-prone sections at Lwera and Kalandazi.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project was awarded to China Communications Construction Company (CCCC) under a Design and Build arrangement. Government documents put the overall project allocation at approximately Shs191 billion, covering the reconstruction of the bridge and works along affected sections of the Kampala\u2013Masaka road.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The new bridge was deliberately designed differently from the structure that was swept away.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In 2024, Works and Transport Minister Gen. Edward Katumba Wamala said government had studied the behaviour of the Katonga River and weather patterns before settling on a new structure capable of withstanding future flooding.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">\u201cWe had to study the meteorological behaviours of that river so that we can make a new structure which is resilient and will stand the test of time,\u201d Katumba said during a parliamentary briefing.<\/p>\n<\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">Construction progressed through 2025 and 2026, with the main bridge structures, deck and approach roads gradually taking shape.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">By May 2026, contractors were carrying out final works on the approaches, with the Ministry of Works and Transport warning motorists about temporary traffic restrictions as asphalt surfacing was completed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project has also involved improvements intended to address the wider flooding problems along the corridor, particularly around Lwera and Kalandazi, where flooding has repeatedly disrupted traffic.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Kampala\u2013Masaka Highway is a critical transport and trade route linking Kampala with Masaka and onward to southwestern Uganda and neighbouring countries. The road carries substantial volumes of passenger vehicles, trucks and trailers.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The restoration of Katonga therefore removes one of the major bottlenecks created by the 2023 floods and restores a more direct connection between Kampala and Masaka.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The reopening is expected to ease traffic pressure, shorten journeys and improve the movement of goods along the corridor.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">However, the completion of Katonga comes after years of disruption in which motorists had to contend with temporary bridges, diversions and congestion while waiting for a permanent solution.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">With the new bridge now open, attention will shift to ensuring that the wider Kampala\u2013Masaka corridor, including the flood-prone Lwera and Kalandazi sections, remains reliable during periods of heavy rainfall.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The restoration of Katonga marks a significant milestone in government&#8217;s efforts to rebuild infrastructure damaged by the 2023 floods and create transport infrastructure capable of coping with increasingly severe flooding events.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Traffic along the Kampala\u2013Masaka Highway is set for a major boost after the newly reconstructed Katonga Bridge was restored and opened to motorists, marking the end of a more than three-year disruption caused by the collapse of the old bridge. The new Katonga Bridge is reported to be 100 percent complete, with the reconstructed structure [&hellip;]<\/p>\n","protected":false},"author":27989,"featured_media":43952,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":{"format":"standard"},"jnews_primary_category":[],"jnews_paywall_metabox":[],"jnews_override_counter":[],"footnotes":""},"categories":[98],"tags":[10385,9465,119],"class_list":["post-43951","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-kampala-masaka-highway-2","tag-katonga-bridge","tag-uganda-news"],"_links":{"self":[{"href":"https:\/\/ugmirror.com\/index.php\/wp-json\/wp\/v2\/posts\/43951","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ugmirror.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ugmirror.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ugmirror.com\/index.php\/wp-json\/wp\/v2\/users\/27989"}],"replies":[{"embeddable":true,"href":"https:\/\/ugmirror.com\/index.php\/wp-json\/wp\/v2\/comments?post=43951"}],"version-history":[{"count":1,"href":"https:\/\/ugmirror.com\/index.php\/wp-json\/wp\/v2\/posts\/43951\/revisions"}],"predecessor-version":[{"id":43953,"href":"https:\/\/ugmirror.com\/index.php\/wp-json\/wp\/v2\/posts\/43951\/revisions\/43953"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ugmirror.com\/index.php\/wp-json\/wp\/v2\/media\/43952"}],"wp:attachment":[{"href":"https:\/\/ugmirror.com\/index.php\/wp-json\/wp\/v2\/media?parent=43951"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ugmirror.com\/index.php\/wp-json\/wp\/v2\/categories?post=43951"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ugmirror.com\/index.php\/wp-json\/wp\/v2\/tags?post=43951"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}